
Platforms, walkways, tank supports, pipe racks, and equipment skids fabricated in our own workshop. Concept GA drawings inside a week, ex-works inside the month, on flatbed to your plant on the date we promised.
Most of our structural work is in support of our own tanks and silos. But the workshop is open: we fabricate platforms, walkways, tank supports, pipe racks, and equipment skids for any plant scope where the design fits Eurocode 3 or AWS D1.1.
Concept drawings come back within five working days. From approved drawings to ex-works delivery is typically three to six weeks depending on tonnage and finish.
Operator platforms around vessels, sample stations, and mezzanine decks. Galvanised grating, kick-plates, and handrails to plant safety code.
Inter-silo catwalks, pipe-bridge walkways, and tank-roof access bridges. Modular bays for fast field assembly.
Vertical tank skirts, horizontal tank saddles, and elevated tank supports for our own tanks or yours.
Multi-tier pipe racks, individual pipe supports, and service-line carrier structures.
Pump skids, instrument skids, packaged ETP skids. Pre-piped and pre-wired ex-works where the spec allows.
Cutting and reinforcement work on existing structures, including in-situ welding and post-weld treatment.
Tell us what you're building. We'll come back with a specification, capacity, and lead time within 48 working hours.
Start02 / Want to talk firstA working call with our engineering team. Walk through what you need, see how we'd approach it, then decide.
Continue03 / Still scopingA field visit to your plant. We measure, photograph, and leave you with a written brief, no commitment from either side.
Continue